1. A rectangular beam 250 mm wide,310 mm effective depth has 3 bars of 12 mm diameter HYSD grade Fe 415 steel bars.Concrete grade is MThe ultimate moment of resistance of the beam is:





Write Comment

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Tags
Show Similar Question And Answers
QA->The maximum bending moment due to moving load on a simply supported beam, occurs:....
QA->A Walther air pistol of which James Bond actor has fetched $415,875 at Christie"s auction house in London on 25-11-2010?....
QA->Who became the leading scorer for Real Madrid after hitting 324 goals from just 310 matches?....
QA->Which country’s national flag is the only non-rectangular national flag?....
QA->The length, breadth, height of a rectangular prism are 20cm, 15cm, and 10 cm respectively. Its whole surface area will be :....
MCQ->A rectangular beam 250 mm wide,310 mm effective depth has 3 bars of 12 mm diameter HYSD grade Fe 415 steel bars.Concrete grade is MThe ultimate moment of resistance of the beam is:....
MCQ->A rectangular beam 250 mm wide, 310 mm effective depth has 3 bars of 12 mm diameter HYSD grade Fe 415 steel bars. Concrete grade is M20. The ultimate moment of resistance of the beam is :....
MCQ->A rectangular RCC beam 230 mm wide x 550 mm effective depth is reinforced with 3 numbers of 16 mm diameter bars.M 20 grade concrete and Fe 415 grade steel are useThe beam section is :....
MCQ->A milk vendor generally sells 3 Grades of milk. Grade I is pure milk with no water mixed in it, Grade II is a mixture of milk and water in the ratio 3:2 and Grade III is a mixture of milk and water in the ratio 2:3. On a particular day he has x liters of Grade I and 3 liters of Grade III milk and he got an order to supply 7 liters of Grade II milk. The minimum value ofx (in litres) required to prepare 7 Its of Grade H milk by mixing Grade I milk, Grade III milk and water, is....
MCQ->Consider for following statements :In an under-reinforced concrete beam, 1. actual depth of neutral axis is less than the critical depth of neutral axis.2. concrete reaches ultimate stress prior to steel reaching the ultimate stress.3. moment of resistance is less than that of balanced sections.4. lever arm of resisting couple is less than that of balanced sections.Which of the statements given above are correct ?....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use
DMCA.com Protection Status Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions