1. Probabilistic estimating of a construction project includes:





Write Comment

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Tags
Show Similar Question And Answers
QA->Cylinder block construction by mono-block is preferred to individual cylinder construction because of?....
QA->The techniques of estimating the age of the remains of a once-living organization?....
QA->List of estimating officers is incorporated in :....
QA->Which Committee’s recommendations are being followed for estimating Poverty Line in India?....
QA->Cost of additional police guards provided to an irrigation project under construction is debitable to:....
MCQ->Probabilistic estimating of a construction project includes:....
MCQ-> There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams — T1 T2, T3, T4 and T5, work on one project each. T1, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest. In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T 3 has one more SE than T4, and T4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows: a. The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team. b. After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted from T5 to T1. Also, if T2 has any SE and T4 has any RE, then one SE is shifted from T2 to T4, and one RE is shifted from T4 to T2. Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.The number of times in which the composition of team T2 and the number of times in which composition of team T4 remained unchanged in two successive months are:
 ....
MCQ-> In the following questions, you have two passages with 5 questions in each passage. Read the passages carefully and choose the best answer to each question out of the four alternatives. PASSAGE-II The National Highways Network of India measures over 70,934 km as of 2010, including over 1,000 km of limited-access expressways. Out of 71,000 km of National Highways 15,000 plus km are 4 or 6 lanes and remaining 50,000 km are 2 lanes. The National Highways Authority of India (NHAI) is the nodal agency responsible for building, upgrading and maintaining most of the national highways network. The National Highways Development Project (NHDP) is a major effort to expand and upgrade the network of highways. NHAI often uses a public-private partnership model for highway development, maintenance and toll-collection. National highways constituted about 2% of all the roads in India, but carried about 40% of the total road traffic as of 2010. The majority of existing national highways are two-lane roads (one lane in each direction), though much of this is being expanded to four-lanes, and some to six or eight lanes. Some sections of the network are toll roads. Over 30.000 km of new highways are planned or under construction as part of the NHDP, as of 2011. This includes over 2,600 km of expressways currently under construction.What is the current measurement of expressways under construction in India ?
 ....
MCQ->Consider the following statements : Non-probability sample includes convenience sample Non-probability sample includes judgment sample Non-probability sample includes quota sample Non-probability sample includes cluster sample. Of the statements :....
MCQ-> One World Trade Centre is viewed as a statement of hope, a marvel of persistence and a miracle of logistics. As years passed after the tragedy at the site at which it was since constructed and the delays kept mounting. Americans began to _____1_____ what’s taking so long ? Have we lost the capacity to rebuild ? The answer in part was the sheer _____2_____ of the project – 10000 workers at-tempting one of the most difficult construction projects ever in one of the most densely populated cities on Earth _____3_____ the funds allotted for the project were estimated as $ 1.5 billion when he design was unveiled but the price tag just kept going up. Other _____4_____ included the weather in the harsh sun of summer the steel beams could reach temperatures that were not enough to singe skin added to which a hurricane _____5_____ the construction site. The monument may not be all things to all people, but its completion signifies that ambition coupled with determination of people in the face of odds is intact and will always win the day.(1)
 ....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use
DMCA.com Protection Status Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions