1. A, B and C. each working alone, can finish a piece of work in 27, 33 and 45 days respectively. A starts by working alone for 12 days, then B takes over from A and works for 11 days. At this stage C takes over from B and completes the remaining work. In how many days the whole work was completed ?






Write Comment

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->Sasi alone can do it in 7 days and Soman alone in 8 days. When the help of another man they can finish the work in 3 days, then what amount does the man get?....
QA->When A, B, C are work together they complete a job in 8 days. When A and C decided to do the work together they completed this job in 12 days. In how many days B alone can complete the work?....
QA->There are 50 students in a class. In a class test 22 students get 25 marks each, 18 students get 30 marks each. Each of the remaining gets 16 marks. The average mark of the whole class is :....
QA->Anil can do a work in 12 days. Basheer can do it in 15 days. Chandran can do the same work in 20 days. If they all work together, the number of days need to complete the work is :....
QA->A and B can do a work in 10 days, B and C can do it in 12 days, C and A can do it in 15 days. If A, B, and C work together, they will complete the work in :....
MCQ->A, B and C. each working alone, can finish a piece of work in 27, 33 and 45 days respectively. A starts by working alone for 12 days, then B takes over from A and works for 11 days. At this stage C takes over from B and completes the remaining work. In how many days the whole work was completed ?....
MCQ-> Directions for the next 5 questions:Sixteen teams have been invited to participate in the ABC Gold Cup cricket tournament. The tournament is conducted in two stages. In the first stage, the teams are divided into two groups. Each group consists of eight teams, with each team playing every other team in its group exactly once. At the end of the first stage, the top four teams from each group advance to the second stage while the rest are eliminated. The second stage comprises of several rounds. A round involves one match for each team. The winner of a match in a round advances to the next round, while the loser is eliminated, The team that remains undefeated in the second stage is declared the winner and claims the Gold Cup.The tournament rules are such that each match results in a winner and a loser with no possibility of a tie. In the first stage a team earns one point for each win and no points for a loss. At the end of the first stage teams in each group are ranked on the basis of total points to determine the qualifiers advancing to the next stage. Ties are resolved by a series of complex tie-breaking rules so that exactly four teams from each group advance to the next stage.What is the total number of matches played in the tournament?
 ....
MCQ-> Answer the following questions based on the information given below:In a sports event, six teams (A, B, C, D, E and F) are competing against each other Matches are scheduled in two stages. Each team plays three matches in Stage – I and two matches in Stage – II. No team plays against the same team more than once in the event. No ties are permitted in any of the matches. The observations after the completion of Stage – I and Stage – II are as given below.Stage-I:• One team won all the three matches.• Two teams lost all the matches.• D lost to A but won against C and F.• E lost to B but won against C and F.• B lost at least one match.• F did not play against the top team of Stage-I.Stage-II:• The leader of Stage-I lost the next two matches• Of the two teams at the bottom after Stage-I, one team won both matches, while the other lost both matches.• One more team lost both matches in Stage-II.The two teams that defeated the leader of Stage-I are:
 ....
MCQ->When they work alone, B needs 25% more time to finish a job than A does. They two finish the job in 13 days in the following manner: A works alone till half the job is done, then A and B work together for four days, and finally B works alone to complete the remaining 5% of the job. In how many days can B alone finish the entire job?....
MCQ->A can do a piece of work in 20 days and B can do the same piece of work in 30 days. They start working together and work for 5 days and then both leave the work. C alone finishes the remaining work in 14 days. In how many days will C alone finish the whole work?....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use
DMCA.com Protection Status Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions