1. Bharat Heavy Electricals is situated at

Answer: Madhya Pradesh

Reply

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Tags
Show Similar Question And Answers
QA->Bharat Heavy Electricals is situated at....
QA->State-ownedBharat Heavy Electricals has successfully commissioned 250 MW thermal unit inwhich state of Indian Country?....
QA->BharatHeavy Electricals Limited (BHEL) has successfully commissioned the second 500MW thermal unit at Marwa Thermal Power Station in....
QA->BharatHeavy Electricals Ltd announced the Commissioning of 600 MW Coal Based Thermalpower plant in which state?....
QA->The bundle is so heavy that I cannot lift it.(Use ‘too’ instead of ‘So that’)....
MCQ->The electronic voting machines are developed jointly with 1.Bharat Heavy Electricals Limited 2.Bharat Electronics Limited 3.Electronics Corporation of India Limited 4.Bharat Sanchar Nigam Limited Select the correct answer using the codes below...
MCQ->The battle tanks designed and developed by the Defence Research and Development Organization in collaboration with Heavy Vehicles Factory and Bharat Heavy Electricals Limited are...
MCQ->Bharat Heavy Electricals Limited (BHEL) commissioned a ________ thermal unit in Maharashtra....
MCQ->The Bharat Heavy Electricals Limited (BHEL) has recently (February, 2016) commissioned a 270 MW generation unit for the 540 MW (2 x 270 MW) coal - fired Goindwal Sahib Thermal Power Project of GVK, Power and Infra Limited located in the Indian state of ……….....
MCQ->Bharat Heavy Electricals Ltd. (BHEL) commissioned 2 units each of 14 Megawatts at the Salma Hydro Electric Project in 2016. Identify the country where this project is located....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use
DMCA.com Protection Status Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions