1. Name of the Branded bottle water project in Sabarimala

Answer: Sabari Theertham

Reply

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Tags
Show Similar Question And Answers
QA->Name of the Branded bottle water project in Sabarimala....
QA->Name of the Clean Sabarimala Project....
QA->I opened the bottle.................. a screwdriver....
QA->whichbank tied up with Bajaj finance for co-branded credit cards?....
QA->Sabarimala Pilgrim Center is situated in....
MCQ->In a shopping mall, five water bottles labeled as A, B, C, D and E were placed in a rack.The bottle A has less price than the bottle B. The bottle C has less price than the bottle D. The bottle B has less price than the bottle C and bottle A has more price than the bottle E. If a costumer want to buy a bottle of maximum price, then which bottle he/she has to buy?...
MCQ-> Consider the following information and answer questions based on it. Seven bottles colored - brown, blue, black, violet, white, indigo and purple are kept in a row, in random order, from left to right such that the — 1. White and purple bottles are not at either extremes. 2. Brown bottle is to the immediate right of violet bottle and to the immediate left of the white bottle. 3. White, violet and brown bottles are not at the center. 4. Black bottle is to the immediate left of purple bottle. 5. Blue bottle is neither second last nor at either extremes.Bottles at the extreme right and left ends are
 ...
MCQ->Bottle 1 contains a mixture of milk and water in 7: 2 ratio and Bottle 2 contains a mixture of milk and water in 9: 4 ratio. In what ratio of volumes should the liquids in Bottle 1 and Bottle 2 be combined to obtain a mixture of milk and water in 3:1 ratio?...
MCQ->A flaming splinter is thrust into a bottle of oxygen, a bottle of nitrogen, anda bottle of carbon dioxide. The flame will go out in...
MCQ-> There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams — T1 T2, T3, T4 and T5, work on one project each. T1, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest. In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T 3 has one more SE than T4, and T4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows: a. The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team. b. After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted from T5 to T1. Also, if T2 has any SE and T4 has any RE, then one SE is shifted from T2 to T4, and one RE is shifted from T4 to T2. Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.The number of times in which the composition of team T2 and the number of times in which composition of team T4 remained unchanged in two successive months are:
 ...
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use
DMCA.com Protection Status Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions