1. The co-ordination number in simple cubic structure is





Write Comment

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Tags
Show Similar Question And Answers
QA->As per alatest study, about how much percent is the 300 Billion Cubic Metre water inRiver Ganga is contaminated by arsenic?....
QA->The GSTcouncil in November 2016 approved four tier tax structure under the Goods andServices Tax (GST). What is that four tier tax structure?....
QA->The three-fifth of a number is 40 more than the 40 percent of the same number. The number is :....
QA->40% of a number is added to 120, then the result is double of the number. What is the number?....
QA->In a Program Graph, ‘X’ is an if-then-else node. If the number of paths from start node to X is ‘p’ number of paths from if part to end node is ‘q’ and from else part to end node is ’r’, the total number of possible paths through X is :....
MCQ->The co-ordination number in simple cubic structure is....
MCQ-> In each of the following questions two rows of number are given. The resultant number in each row is to be worked out separately based on the following rules and the question below the row is to be answered. The operations of number progress from the left to right. Rules: (i) If an even number is followed by another even number they are to be added. (ii) If an even number is followed by a prime number, they are to be multiplied. (iii) If an odd number is followed by an even number, even number is to be subtracted from the odd number. (iv) If an odd number is followed by another odd number the first number is to be added to the square of the second number. (v) If an even number is followed by a composite odd number, the even number is to be divided by odd number.I. 84 21 13 II. 15 11 44 What is half of the sum of the resultants of the two rows ?....
MCQ->  Answer the questions based on the following information. Production pattern for number of units (in cubic feet) per day. The finished goods are to be transported to the market by a truck having a capacity of 2000 cubic feet. Any finished goods (ready at the end of the day) retained overnight at the factory will incur a storage cost of Rs 5 per cubic foot for each night of storage. The hiring cost for the truck is Rs 1000 per day.If all the units should be sent to the market, then on which days should the trucks be hired to minimize the cost?
 ....
MCQ->In a reservoir the average volume of sediment deposition is 0.15 million cubic per year. If the dead storage and total capacity of the reservoir are 8 million cubic metres and 36 million cubic metres respectively,....
MCQ->Consider the following features of 'structures' in C? The values of a structure variable can be assigned to another structure variable of the same type using the assignment operator.One structure can be nested within another structure.A variable structure can also be passed to a function. Which of the above are correct?....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use
DMCA.com Protection Status Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions