41401. The minimum width of a septic tank is taken
41402. The item of the brick structure measured in sq.m, is
41403. The inspection pit or chamber is a manhole provided in a base drainage system
41404. In the mid-section formula
41405. The item of steel work which is measured in sq.m, is
41406. The value of 'C' of Indian type W.C. shown in the given figure is :
41407. The area of a sloping surface of a protective embankment of mean height d, side slopes S : 1 and length L is
41408. If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
41409. The most reliable estiamte is
41410. The expected out turn of 12 mm plastering with cement mortar is
41411. The main factor to be considered while preparing a detailed estimate, is
41412. The damp proof course (D.P.C.) is measured in
41413. The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is
41414. The area is measured correct to the nearest
41415. Cost of fittings and their fixing is specified for the following sanitary fittings
41416. The volume is measured correct to the nearest
41417. The social reformer who led the Kallumala Agitation:
41418. Pick up the item whose weight is added to the weight of respective item, is
41419. The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is
41420. While estimating a reinforced cement structure, the omitted cover of concrete is assumed
41421. The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
41422. The slogan”Travancore for Travan Corean’s was associated with which event:
41423. If tensile stress of a steel rod of diameter D is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of the rod is
41424. The measurement is not made in square metres in case of
41425. According to ISI method of measurement, the order of the sequence is
41426. The assumption on which the trapezoidal formula for volumes is based, is
41427. The cross-sections for a highway is taken at
41428. The detention period in a septic tank is assumed
41429. For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
41430. For the construction of buildings, the subheads of the estimate are
41431. The measurement is made for stone work in square metre in case of
41432. The 'centre line method' is specially adopted for estimating
41433. The value of 'A' of Indian type W.C. shown in the given figure is :
41434. Referring of given figure, pick up the correct statement from the following:
41435. Size, capacity and materials need be specified for
41436. A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
41437. The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is
41438. Anti-siphonage pipe is connected to
41439. The directive principle of state policy is contained in which part of the constitution:
41440. Carpet area does not include the area of
41441. The trap which is provided to disconnect the house drain from the street sewer is called
41442. Who made the famous statement of “the difference between journalism and literature is that journalism is unreadable and literature is not read?
41443. Pick up the correct statement regarding the centre line method of estimating a building
41444. The 2018 Women’s Hockey World Cup will be held in which country?
41445. The expected out turn of half brick partition wall per mason per day is
41446. If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
41447. The floor area includes the area of the balcony up to
41448. According to Indian Standards Institute, the actual size of modular bricks is
41449. While estimating the qualities for the construction of a building, the correct metric unit is
41450. The slope of the oultet of 'P trap' below the horizontal is kept