<<= Back Next =>>
You Are On Multi Choice Question Bank SET 1016

50801. Which of the following capabilities is required for a system program to execute more than one program at a time?






50802. The part of machine level instruction, which tells the central processor what has to be done, is






50803. Which of the following refers to the associative memory?






50804. To avoid the race condition, the number of processes that may be simultaneously inside their critical section is






50805. Among the following,in which type of canal,flow occurs only when there is a rise of flow in river?





50806. Process is






50807. What is defined as the ratio of volume of air voids to the total volume of air voids to the total volume of soil mass and is expressed as percentage?





50808. What is the side slope of a Cipoletti weir?





50809. How the temporary hardness of water is removed?





50810. In which of the following types of concrete beam section,failure will occur all on a sudden?





50811. In which condition a doubly reinforced beam is used?





50812. The approach used in top-down analysis and design is






50813. Which of the following is not a factor in the failure of the systems developments projects?






50814. A Ring, refers to a record chain, the last of which refers to the first record, in the chain, is called a/an






50815. The primary tool used in structured design is a:






50816. A problem's _____ will answer the question, "What information will the computer need to know in order to either print or display the output times?"






50817. Which of the following statements, is (are) not true for the lease option






50818. The two classifications of inputs are






50819. Documentation is prepared






50820. System Implementation Phase entails






50821. Which of the following is not true of the conversion phase of the development life cycle?






50822. Managers who are potential users of the MIS






50823. Positive testing is






50824. Data Definition Language (DDL)




50825. In phase 1 of the system development life cycle, which of the following aspects are usually analyzed?






50826. During the maintenance phase






50827. To run the old system and the new system at the same time for a specified period, the system implementation approach used is






50828. The mistake, committed by interchanging two digits in a numeric held, during data entry, is called






50829. Decision tree uses






50830. Problem analysis is done during






50831. Top-down programming is





50832. A decision table facilitates conditions to be related to






50833. On the feasibility committee, department representatives serve as:






50834. A _____ is an outline of a process that keeps develop successful information systems






50835. A branch office, location or other data processing centres, where a newly developed system is used under normal operating conditions for several months, to test it, is called






50836. An appraisal, of a system's performance after it has been installed, is called system






50837. Elapsed time, between initiating a query and receiving a response is called






50838. During the system study, the executive vice-president and the other managers exercise their responsibility of






50839. Which of the following is (are) not a tool for Application Prototyping?






50840. Data manipulation language (DML)





50841. The set of. instructions for how to tie a bow is an example of the _____Structure.






50842. Which of the following appropriately explains the desirable characteristic of good system design?






50843. An example of a hierarchical data structure is






50844. On a systems flowchart, the online manual keeping of input data is identified by using the






50845. Which of the following is not a characteristic of good test data






50846. In the system concepts, term Integration






50847. Indexed-Sequential organization






50848. Management's decision to rent a computer system may be based upon






50849. The rule(s) to follow in constructing decision tables is (are):






50850. Which are the tools not used for System Analysis






<<= Back Next =>>
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use
DMCA.com Protection Status Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions