26. The approximate cost of a building having plinth area of 300. Sq.m @Rs 1500 per Sq.m works out as:
27. The amount provided in the estimate and hill of quantities for some specialized work‘to be done by a specialist firm whose details are not known at the time of preparing estimate is called:
28. The measurement is done in Sq.m for :
29. Pick the correct statement from the following :
30. The quantities of brickwork and plastering required in a wall 5 m long, 3 m high and 20 cm thick are:
31. The centre line length of a single room building of size 6.5 x 5 m and wall thickness 30 cm is:
32. The data necessary to prepare an estimate is :
33. Comparative statement is necessary for the preparation of:
34. The term used to indicate the actual amount incurred in producing a commodity which possess some value:
35. The rate of wear of stones which are used in road construction can be found out by :
36. The lower the water cement ratio:
37. Vertical joints separating the bricks by mortar is :
38. ISMC indicates:
39. A waste from the manufacture of pig iron is usedfor which cement?
40. White lead in paint acts as a :
41. The process by which timber is cut and sawn into suitable sections is known as:
42. A stiff and extra stiff concrete mix is indicated by :
43. The number of risers and treads required for a doglegged stair, if the height upto'the top of the roof slab is 300 cm and rise = 15 cm :
44. Rind Galls are :
45. The range of camber of cement concrete road surface in the heavy rainfall area to light rainfall area is:
46. Width of roadway at plain and rolling terrain for National and State highways is :
47. PIEV Theory is related to :
48. By Impact test, we can evaluate :
49. The softening point of various Bitumen grades used in paving jobs vary between :