85801. In hit and miss governing, the fuel supply is cut-off completely during one or more number of cycles.
85802. The thermal efficiency of a standard Otto cycle for a compression ratio of 5.5 will be
85803. In value engineering, the term value refers to
85804. In inventory control theory, the economic order quantity is
85805. Production cost refers to prime cost plus
85806. A systematic job improvement sequence will consist of
85807. Work sampling is applied for
85808. Military type of organisation is known as
85809. When slack of an activity is negative
85810. The procedure of modifying work content to give more meaning and enjoyment to the job by involving employees in planning, organisation and control of their work, is termed as
85811. Fixed position layout is also known as
85812. In a network shown in the below figure, the critical path is along
85813. Bar chart is suitable for
85814. Which one of the following chart gives simultaneously information about the progress of work and machine loading?
85815. Probabilistic time for completion of any activity can be found out from
85816. Line organisation is suitable for a big organisation.
85817. PERT is an event oriented technique.
85818. Linear programming model can be applied to line balancing problem and transportation problem.
85819. The chart which gives an estimate about the amount of materials handling between various work stations is known as
85820. The type of organisation preferred for a steel industry, is
85821. A device used for lifting or lowering objects suspended from a hook at the end of retractable chains or cable is called
85822. A diagram showing the path followed by men and materials while performing a task is known as
85823. The determination of standard time in a complex job system is best done through
85824. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be
85825. In a line organisation
85826. Which of the following are the guidelines for the construction of a network diagram?
85827. Work study involues
85828. A-B-C analysis is used in
85829. PERT analysis is based upon
85830. In order to avoid excessive multiplication of facilities, the layout preferred is
85831. In A-B-C analysis, which class of items are generally large in number?
85832. Simplex method is the method used for
85833. Dispatching
85834. Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?
85835. Job evaluation is the method of determining the
85836. The routing function in a production system design is concerned with
85837. In big automobile repair shop, for elevating and moving the heavy parts such as complete engine assembly, gear box etc., an overhead crane and a fork lift truck is used.
85838. Direct expenses include
85839. String diagram is used
85840. Which of the following type of layout is suitable for automobile manufacturing concern?
85841. Representative time is the average of times recorded by work study man for an operation.
85842. Queuing theory is associated with
85843. PERT requires
85844. The product layout is more amenable to automation than process layout.
85845. In break even analysis, total cost consists of
85846. A critical activity has
85847. Sampling method of determining standard time is profitable for long cycle operation.