You Are On Multi Choice Question Bank SET 820

41001. If 1500 g of water is required to have a cement paste 1875 g of normal consistency, the percentage of water is,






41002. Under normal conditions using an ordinary cement, the period of removal of the form work, is :






41003. Wp and Wf are the weights of a cylinder containing partially compacted and fully compacted concrete. If the compaction factor is 0.95, the workability of concrete is






41004. For given water content, workability decreases if the concrete aggregates contain an excess of






41005. Two colour letters are stamping while using two color ribbons.It is called:





41006. Default bottom page margin of word 2003 is:





41007. The part of supplying paper to impression roller is known as:





41008. Shortcut key to cut the selected text:





41009. ”Arial black”is considered as:





41010. In the given figure, the network of a project represents





41011. Pick up the PERT event from the following:






41012. If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then the following relation holds good






41013. Final technical authority of a project lies with





41014. The performance of a specific task in CPM, is known





41015. Spelling and grammar option can be taken from:





41016. A Milestone chart





41017. Completion of an activity on CPM network diagram, is generally known





41018. A dummy activity





41019. Military organisation is known as





41020. Quark Xpress is an example of software used in:





41021. Various activities of a project, are shown on bar charts by





41022. Time and progress chart of a construction, is also known as






41023. Critical Path Net Work helps an engineer





41024. The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as





41025. The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as





41026. Henry Gantt developed Bar charts for planning and scheduling of projects in






41027. The most popular type of organisation used for Civil Engineering Constructions, is





41028. The difference between the time avail-to do a job and the time required to do the job, is known as





41029. The object of technical planning, is






41030. The salient feature of functional organisation is






41031. Critical path method






41032. CPM is






41033. Critical path lies along the activities having total float





41034. Construction team means






41035. Pick up the correct network for the activities of pouring concrete, erection of form work, removal of form work and curing of concrete from the following:





41036. A construction schedule is prepared after collecting






41037. Site order book is used for recording





41038. An Executive Engineer may have powers upto






41039. The main principle of an organisation, is






41040. The estimated time required to perform an activity, is known as





41041. A CPM family includes






41042. The time which results in the leasi, possible construction cost of an activity, is known





41043. If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be





41044. Works costing less than Rs. 20,000 are treated as





41045. A critical ratio scheduling






41046. Bar charts are suitable for





41047. The first method invented for planning projects, was





41048. If TL is the latest allowable event occurrence time, total activity slack(s), is equal to





41049. The Overall in-charge of an organisation at the site responsible for the execution of the works, is






41050. Modular co-ordination of construction means proper





<<= Back Next =>>
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use
DMCA.com Protection Status Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions