Go To Top Reset
<<= Back
Next =>>
You Are On Multi Choice Question Bank SET 3221
161051. As per IS code, size of concrete cube for compression test is :
(A): 5 cm (B): 10 cm (C): 15 cm (D): 25 cm
161052. The process by which limestone is heated to redness to form lime is called
(A): Hydraulicity (B): Slaking (C): Setting (D): Calcination
161053. Which one is a solvent used in paint?
(A): White lead (B): Graphite (C): Linseed oil (D): Turpentine
161054. The process of preventing loss of moisture from concrete :
(A): Bulking (B): Curing (C): Bleeding (D): Guniting
161055. The basic value of span to effective depth ratio for span upto 10 m for Cantilever beam is
(A): 10 (B): 20 (C): 7 (D): 26
161056. l.S. code of practice for plain and reinforced concrete :
(A): l.S.962-1989 (B): l.S. 800-1984 (C): LS.456-2000 (D): l.S. 458-2003
161057. The layout of existing and proposed water supply, electricity, drainage lines are given in :
(A): Site plan (B): Service plan (C): Building plan (D): Key plan
161058. Maximum permissible coverage for a assembly building is :
(A): 65 (B): 40 (C): 35 (D): 30
161059. The difference between the forebearing and back bearing of a line is:
(A): 180° (B): 270° (C): 360° (D): 0°
161060. The horizontal angle between the magnetic meridian and geographical meridian is called
(A): Azimuth (B): Declination (C): Latitude (D): Dip
161061. The apparent movement of the image relative to the cross hairs is called :
(A): Foresight (B): Parallax (C): Tilting (D): Refraction
161062. The length of revenue chain :
(A): 20 m (B): 100 ft (C): 33 ft (D): 66 ft
161063. It is difficult to replot the map on a different scale insurvey.
(A): Compass (B): Chain (C): Theodolite (D): Plane Table
161064. The principle of chain survey is :
(A): triangulation (B): whole to part (C): fixing up of points (D): traversing
161065. Which.one is not an ablution fitting?
(A): Wash basin (B): Sink (C): Bath tub (D): Trap
161066. prevents the entry of sewer gases from the public sewer line into the house
(A): floor trap (B): gully trap (C): intercepting trap (D): none
161067. is a type of rivetted joint.
(A): scarfed joint (B): single cover butt joint (C): tabled joint (D): double tenon joint
161068. Brickwork is measured in :
(A): Cu.m (B): dm (C): Sq.m (D): 10 Sq.m
161069. Size of A2 drawing sheet in mm is :
(A): 420 x 594 (B): 841x1189 (C): 594 x 841 (D): 210 x 297
161070. Hatching or section lines are generally drawn at an angle of :
(A): 30° (B): 60° (C): 90° (D): 45°
161071. The eccentricity of an ellipse is :
(A): equal to 1 (B): greater than 1 (C): less than 1 (D): zero
161072. A road provided around congested area is called :
(A): By-pass road (B): Ring road (C): Trunk road (D): Loop road
161073. The convexity provided to the surface of carriageway :
(A): Kerb (B): Camber (C): Gradient (D): Super elevation
161074. The width of a broad gauge railway track :
(A): 1.676 m (B): 1 m (C): 0.762 m (D): 1.483 m
161075. A system of tracks at a station used for storing,sorting and despatching vehicles :
(A): station (B): signals (C): yard (D): crossing
161076. Semaphore signals are also called as :
(A): Warner signals (B): Ground signals (C): Routing signals (D): Stop signals
161077. The flooring of bridge is supported on the top of supports in :
(A): deck bridge (B): through bridge (C): slab bridge (D): semi through bridge
161078. Seismic load is checked forresistance.
(A): Dead weight (B): Wind (C): Snow (D): Earthquake
161079. EDM stands for:
(A): Easy Direct Measurement (B): Electronic Direct Measurement (C): Electronic Distance Measurement (D): Electronic Direct Management
161080. The size of letter is described by its :
(A): Height (B): LengthLength (C): Breadth (D): ThicknessThickness
161081. An example for Kharif crop is :
(A): wheat (B): rice (C): barley (D): gram
161082. Cross drainage work provided when the bed level of canal is higher than the H.F.L. of drainage :
(A): Aqueduct (B): Weir (C): Level crossing (D): Superpassage
161083. Building drawings are prepared in :
(A): Full scale (B): Enlarged scale (C): Plain scale (D): Reduced scale
161084. All type of house waste and garbage in dry form is called :
(A): sewage (B): sullage (C): drainage (D): refuse
161085. The distance between the surfaces of bars and concrete is called :
(A): Slump (B): Lap (C): Cover (D): Rebate
161086. The longitudinal movement of rails in a track is :
(A): cant (B): creep (C): coning (D): packing
161087. The watering applied to the land before sowing of a crop is called :
(A): Paleo (B): Kor watering (C): Duty (D): Delta
161088. Della is measured in :
(A): Hectares/cumecs (B): Cumecs (C): Days (D): Metre
161089. A large artificial lake created by constructing a dam across a river is called a :
(A): canal (B): pond (C): reservoir (D): still pocket
161090. The process of cutting stones into suitable sizes and surfaces after quarrying is called :
(A): dressing (B): seasoning (C): curing (D): finishing
161091. A cut made inside a frame to receive the shutter is known as :
(A): Reveal (B): Sash (C): Jamb (D): Rebate
161092. The triangular space formed in an arch between the extrados and crown is termed as:
(A): Soffit (B): Spandril (C): Haunch (D): Skewback
161093. In------------arch, the depth at crown is more than that at the springing line.
(A): Venetian (B): Florentine (C): Horse shoe (D): Stilted
161094. Which one of the following is not a one centred arch?
(A): Bull's eye (B): Segmental (C): Pointed (D): Stilted
161095. The wedge shaped units forming the courses of an arch :
(A): Winders (B): Springer (C): Crown (D): Voussoirs
161096. The window which project outside the external wall is a :
(A): Dormer window (B): Skylight (C): Bay window (D): Lanterns
161097. The edge of a gable running between the eaves and ridge is known as :
(A): Valley (B): Verge (C): Gutter (D): Hip
161098. The triangular upper part of a wall farmed at the end of pitched roof is a :
(A): Gable (B): Valley (C): Quoin (D): Truss
161099. Small blocks of wood which are fixed on the truss to prevent sliding of purlins is :
(A): Batten (B): Template (C): Ridge (D): Cleat
161100. Total length of stair in a horizontal plane is called :
(A): run (B): pitch (C): width (D): landing
<<= Back
Next =>>
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use
Powered By:Omega Web Solutions © 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions